During the development phase (2016-2018), SLCP received funding from the SAC; the C&A Foundation; Netherlands Ministry of For..
18487986519 Contact us
Release time:2021-12-17 Read:
During the development phase (2016-2018), SLCP received funding from the SAC; the C&A Foundation; Netherlands Ministry of Foreign Affairs; and the Norges Bank Investment Management.
Since the beginning of 2019, SLCP has been implementing a 5-Year Strategic Plan that includes a roadmap for the Program to become self-sustaining by 2021. This will be achieved through volume-driven fees (linked to SLCP adoption) based on the number of verifications conducted & the number of verifiers and Accredited Hosts participating in the system.
In 2019, SLCP’s budget was made up of a small proportion of earned income and the rest was signatory donations. In 2020, funding was received for two specific projects: training roll-out and the Tool review.
Remediation is not included in SLCP’s Converged Assessment Framework. ...
During the development phase (2016-2018), SLCP received funding from t...
SLCP is not a standard and does not provide certification. The Converg...
SLCP signatories developed the Converged Assessment Framework between ...
Block A, Guanghao International Center, Minzhi Street, Longhua District, Shenzhen, China
Bangkok, Thailand
Ho Chi Minh, Vietnam